All Buildings
(800) 439-5095

All Buildings (800) 439-5095All Buildings (800) 439-5095All Buildings (800) 439-5095

All Buildings
(800) 439-5095

All Buildings (800) 439-5095All Buildings (800) 439-5095All Buildings (800) 439-5095
  • Home
  • Tubular Installs
  • Red Iron & Pole Barns
  • Reviews
  • Blog
  • Contact Us
  • More
    • Home
    • Tubular Installs
    • Red Iron & Pole Barns
    • Reviews
    • Blog
    • Contact Us
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Tubular Installs
  • Red Iron & Pole Barns
  • Reviews
  • Blog
  • Contact Us

Account

  • My Account
  • Sign out

  • Sign In
  • My Account

"Leveling Ground Like a Pro: Avoid These 5 Costly Mistakes"

Introduction

Your tubular steel building — whether it’s a barndominium, shop, RV cover, or barn — is only as solid as the ground beneath it. If your base isn’t level, you can expect headaches ranging from uneven doors to serious structural stress. Many DIY site prep projects fail not because the builder lacks effort, but because of a few avoidable mistakes. Here’s how to sidestep them and get a perfectly level foundation the first time.

1. Skipping a Soil Assessment

The Problem: Building on loose or expansive soil without testing it first can lead to settling, shifting, or cracks in your foundation.


Pro Tip:


Have your soil tested — or at least dig a few test holes. Sandy soils may need compaction, and clay soils may require additional drainage to prevent swelling.

2. Forgetting to Remove Organic Material

The Problem: Grass, roots, and topsoil might seem harmless, but they decompose over time, causing soft spots and uneven settling.


Pro Tip:


Clear all vegetation and remove at least the top 4–6 inches of soil before leveling. Replace with compactable fill dirt or gravel.

3. Not Compacting the Base

The Problem: Even if your site looks flat, un-compacted soil will settle under the weight of your structure, creating dips and cracks.


Pro Tip:


Use a plate compactor or roller to firmly pack the soil. This step is non-negotiable for both concrete and gravel bases.

4. Ignoring Proper Drainage

The Problem: A perfectly level pad is useless if water collects under or around your structure, leading to erosion or foundation damage.


Pro Tip:


Grade the surrounding area to slope away from the building. For wet climates, consider installing French drains or gravel trenches.

5. Using the Wrong Tools

The Problem: Eyeballing “level” or relying on a short carpenter’s level is a recipe for uneven results.


Pro Tip:


Invest in a laser level, builder’s transit, or at least a long string level. Precision now saves thousands in repairs later.


Bonus Tip: Mark Twice, Build Once


Before pouring concrete or laying gravel, double-check your building footprint with stakes and string lines. A misaligned base can delay installation and even void warranties.

Conclusion

Leveling ground for your tubular steel building isn’t complicated — but it is exact. Avoid these five mistakes, and you’ll set the stage for a strong, durable foundation that supports your structure for decades.


Copyright © 2022 - All Buildings - All Rights Reserved.


Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept